DALLAS N.TOLLWAY-ELDORADO TO US 380

This project for NTTA was for the construction of over 3 miles of toll road with frontage roads on new right of way.  The project consisted of 250,944 CY of excavation, over 1 million CY of embankment, 255,000 SY of concrete pavement, 9 bridges, 207,000 SF of bridge deck, 257,000 SF of retaining walls and 39,000 LF of storm drainage.